ONE-OFF JOBS
EV charger installation in Adelaide. Plug in at home, wake up full.
Fixed price before I start. Your switchboard checked first. Tested, certified, done.
A powerpoint charger takes all night. And then some.
The cable that came with the car plugs into a normal powerpoint. It works. Just slowly.
Some nights it doesn't get you full. And a normal powerpoint was never made to run flat out for 12 hours, night after night.
A proper wall charger fixes that. But it has to go in right, on a board that can take it.
What happens if you leave it
- You run on a half charge, or pay more at public fast chargers.
- A powerpoint and lead pushed hard every night can run hot.
- A charger put on an old board can trip the house when the oven and air con are on.
How I do it
- 01
Tell me about your car and garage.
Send a photo of your switchboard and where you park.
- 02
I check your power.
Single or three phase, room on the board, and the cable run to the garage.
- 03
You get a fixed price.
Charger, cable, safety switch, labour. One number.
- 04
I install and test it.
Wall mounted, on its own circuit, with its own protection.
- 05
I set it up with you.
App connected, solar charging set if you have panels, and your certificate of compliance.
The chargers I fit
I'm an Evnex Certified Installer. Evnex is my go-to: smart, solar-ready chargers with an app to schedule and track your charging.
Evnex E2 Flex.
7.4 kW on single phase. The simple, no-fuss option. Solar charging can be added.
Evnex E2 Core.
7.4 kW, with smart solar charging for homes with panels.
Evnex E2 Plus.
7.4 kW with 4G as well as Wi-Fi, and load balancing between chargers. Good for two-EV homes.
Evnex X22.
For three-phase homes that want faster charging.
Got a charger already, or want a different brand? Tell me the model and I'll price the install.
Worth knowing before you buy
- Switchboard space and safety switch
- Single or three phase
- Distance from board to garage
- Solar charging set-up
- Wi-Fi or 4G in the garage
- Charger on its own circuit
The promise
Fixed price before I start. On time or you hear from me first. Tested, clean, done.
My guarantee
You never pay twice for my work.
If I'm late without telling you, or my work isn't right, I come back and fix it at my cost.
What customers say
Very happy with David's work. He is knowledgeable, reliable, and easy to deal with. Everything was done professionally and with great care. Communication was clear, and he was punctual and responsible throughout the job.
FAQs
Do I need a switchboard upgrade for an EV charger?
Sometimes. If your board is old, full or has no safety switches, it may need work first. Send me a photo and I'll tell you straight.
Single phase or three phase?
Most Adelaide homes are single phase. The Evnex E2 range charges at up to 7.4 kW on single phase. Three phase homes can go faster with the Evnex X22.
Can it charge from my solar panels?
Yes. Evnex chargers can be set to use your spare solar first, so you charge from the sun instead of the grid.
Can you install a charger I already bought?
Yes. Tell me the brand and model and I'll give you a fixed price to install it.
Do I get paperwork?
Yes. A certificate of compliance for the electrical work.
Free for renovators
The Adelaide Renovator's Electrical Checklist
23 electrical decisions to make before your walls are plastered. Miss one, and you pay to cut the plaster open later.
Loading the form. If it doesn't appear, call or text 0417 397 165.
Tell me what you need. I'll tell you what it costs.
Call or text 0417 397 165. You'll talk to me, not a call centre.
